PP235 3BSC690102R2 Keyboard Membrane Replacement

  • group nameAB Other Series

  • Min Order1 piece

  • brand nameVICPAS

  • modelPP235 3BSC690102R2

  • payment methodWestern Union, MoneyGram, T/T, Paypal, PayPal, Credit Card

  • update timeFri, 08 Nov 2024 12:10:37 GMT

Paramtents

  • Warranty 365 Days

  • Product Line Process Panel 235

  • Supply Operator Keyboard

  • Shipping 2-3 workdays

  • Part Number PP235 3BSC690102R2

Packging & Delivery

  • Min Order1 piece

Briefing

Process Panel 235 3BSC690102R2 Membrane Switch Replacement. 365 Days Warranty-Fully Tested-Factory Prices-Fast Shipping.

Detailed

Process Panel 235 PP235 3BSC690102R2 Terminal Keypad Repair Replacement

Order each part separately is available

PP235 3BSC690102R2 Membrane Keypad Replacement

VICPAS supply Process Panel 235 PP235 3BSC690102R2 Membrane Switch with 365 Days warranty and support Urgent Worldwide Shipping.


Designed to make process automation easy, PP235 3BSC690102R2 Membrane Keypad Switch panels are equipped with advanced process and equipment control functionality, maneuvered by touching the LCD display. With market-leading performance and stunning graphical ability, Process Panel 235 erodes the line between ordinary Operator Panels and PC- based HMIs. Panels are configured using Panel Builder tool which contains a wide range of advanced functions. The functions are tested and developed with customer needs and preferences in focus.


Process Panel 235 is a user-friendly, intuitive and ergonomic operator panel that combines slim, space-saving dimensions with a comprehensive range of advanced functions. PP235 3BSC690102R2 Membrane Keyboard Keypad Process Panel 235 family comprises user-friendly, intuitive and ergonomic operator panels that combine slim, space-saving dimensions with a comprehensive range of advanced functions. Adding to the already well-established feature-rich Process Panel 235 our new Rugged and Black panels are designed to perform in challenging harsh environments. Whether it is heavy outdoor use, usage in areas with explosion risk, or ship bridge use in marine applications, they are ready to provide you with the information needed.





Specifications:

The table below describes the parameters of the PP235 3BSC690102R2 Membrane Keypad Switch Process Panel 235.

Brand: VICPAS
Backlight: LED/CFL
Display Type: TFT Color LCD
Part Number: PP235 3BSC690102R2
Product Line: Process Panel 235
Backlight Lifetime: 50,000 hours
Display Size: 5.7 inches
Operating Temperature: -10 °C to +60 °C
Storage Temperature: -20 °C to +70 °C
Warranty: 365 Days


Related Process Panel Terminals Part No. :

Process Panel Description Inventory status
PP114 3BSC690097R1 Process Panel 114 Membrane Keyboard Keypad Repair In Stock
PP114 3BSC690097R2 Process Panel 114 Operator Keyboard Replacement Repair In Stock
PP210 3BSC690098R2 Process Panel 210 Series Operator Panel Keypad Repair Available Now
PP220 3BSC690099R1 Process Panel 220 Membrane Keypad Switch Replacement Available Now
PP220 3BSC690099R2 Process Panel 220 Series Membrane Keyboard In Stock
PP235 3BSC690102R1 Process Panel 235 Series Membrane Keypad Replacement In Stock
PP235 3BSC690102R2 Process Panel 235 Series Terminal Keypad Replacement Available Now
PP245 3BSC690103R1 Process Panel 245 Series Keyboard Membrane Repair In Stock
PP245 3BSC690103R2 Process Panel 245 Series Keypad Membrane Replacement Available Now
PP245B 3BSC690126R2 Process Panel 245B Series Switch Membrane Repair In Stock
PP320 3BSC690100R1 Process Panel 320 Series Touch Screen Replacement In Stock
PP320 3BSC690100R2 Process Panel 320 Series Touch Screen Monitor Replacement In Stock
PP325 3BSC690101R2 Process Panel 325 Series Touch Digitizer Glass Repair Available Now
PP345 3BSC690104R1 Process Panel 345 HMI Panel Glass Replacement In Stock
PP345 3BSC690104R2 Process Panel 345 Series HMI Touch Glass Replacement Available Now
PP345B 3BSC690127R2 Process Panel 345B Series MMI Touch Panel Replacement In Stock
Process Panel Repair Description Inventory status


Process Panel HMI Manuals PDF Download:

  • 3BSC690098R2 Datasheet
  • 3BSC690102R2 Datasheet
  • 3BSC690104R2 Datasheet
  • 3BSC730100R1 Datasheet
  • AMR3BSC690100R2 Datasheet
  • AMR3BSC690101R2 Datasheet
  • EXC3BSC690097R2 Datasheet
  • REP3BSC690099R2 Datasheet
  • REP3BSC690102R2 Datasheet
  • REP3BSC690103R2 Datasheet

  • FAQ:

    Question: Installation Process

    Solution: The following is needed:
    • ATorxTX7screwdriver
    1. Unpack and check the delivery. If damage is found, notify the supplier.
    2. Place the operator panel on a stable surface during installation. Dropping the operator panel or letting it fall may cause damage.
    3. To cut a correct opening for the operator panel, use the cut out dimensions in the outline drawing.
    4. Secure the operator panel in position by screwing the M4 Torx screw, allowing the built-in bracket to tighten against the panel:
    Installation Process
    5. Connect the cables in the specified order, according to the drawing and steps below.
    • The operator panel must be brought to ambient temperature before it is started up. If condensation forms, ensure that the operator panel is dry before connecting it to the power outlet.
    • Ensure that the operator panel and the controller system have the same electrical grounding (reference voltage level), otherwise errors in communication may occur.
    • Ensure that the voltage and polarity of the power source is correct.
    • Separate high voltage cables from signal and supply cables.
    • Shielded communication cables are recommended.
    Installation Process
    – Connect cable A.
    – Connect cable B, using an M5 screw and a grounding conductor (as short as possible), that is sized correctly according to local electrical codes.
    – Connect cable C.
    – Connect cable D. The recommended cross-section of the cable is 1.5 mm2..
    6. Carefully remove the protective film over the operator panel display, take care to avoid static electricity that could damage the panel.

    Common misspellings: 

    PP235 3BSC69012R2
    P235 3BSC690102R2
    PP235 3BSC609102R2
    PP235 38SC690102R2
    PP235 3BSC6901102R2
    Nearest port for product export
    Guangzhou, Hongknog, Shenzhen, Taiwan
    Delivery clauses under the trade mode
    FOB, CFR, CIF, EXW, FAS, CIP, FCA, CPT, DEQ, DDP, DDU, Express Delivery, DAF, DES
    Acceptable payment methods
    T/T, L/C, D/P D/A, MoneyGram, Credit Card, PayPal, Westem Union, Cash, Escrow
    Contact Suppliers

    Follow this Suppliers