China manufacture prefabricated Steel structure building for super market hotel restaurant in Philippines

FOB Price
  • US $30.00

    500 - 5,000 square meter

  • group nameMulti-storey Steel Structure

  • Min Order500 square meter

  • brand nameZYM steel structure building Manufacturer

  • payment methodL/C, T/T

  • update timeFri, 15 Dec 2023 10:49:14 GMT

Paramtents

  • key word Steel structure super market hotel in philippines

  • Place Philippines steel structure building

  • Application steel structure commercial market hotel

  • Size 4 layer steel structure building 10000sqm

  • Frame material Q355B H type steel structure

  • Color special steel structure building color for choice

  • Production time 35 days

  • Installation special steel structure engineers 2 months finish

  • Design 3DMAX,CAD,TEKLA

  • Steel structure manufacture zone China steel structure manufacture

  • steel structure manufacture shandong zhengyuanming steel structure

  • steel structure mainly market Philippines steel structure projects

  • steel structure mainly project steel structure commercial buildings

Packging & Delivery

  • Min Order500 square meter

Briefing

1.Steel structure is lighter in weight 2.High reliability of prefab steel structure work 3.The steel is resistant to vibration

Detailed

Project NameChina manufacture prefabricated Steel structure building for super market hotel restaurant in Philippines
Project Area:9800 square meters
Introduction of The China manufacture prefabricated Steel structure building for super market hotel restaurant in Philippines;
1,We got all the design data from clients,such as the wind speed ,the earthquack 2,Clients provide us the steel structure sizes and layout,then we make the design according to the layout by CAD,after many times communication of the function zone,then we confirmed a best design of the whole building.3,After the main steel frame confirmed,we made the 3D design for clients. And other details of the outside &interior decoration panels,partitions we confirmed with client.4,All the steel structure frame are prefabricated in our factory,most of the main steel structure column use the box column,the beam all H type beam. Floors brace all use steel structure brace for cement. 5,The installation we send 2 engineers for the guide,within 3 months all the steel structure frame finished. So it is very fast and very economic.
The feature of the steel structure hotel building: 
1. Steel structure is lighter in weight  
2. High reliability of prefab steel structure work 
3. The steel is resistant to vibration and impact resistance
4. The degree of industrialization of steel structure manufacturing is relatively high 
5. Prefabricated Steel structure can be assembled accurately and quickly 
6. Large steel room interior space 
7. Easy to make a sealed structure
8. Steel structure is easy to corrode 
9. Steel structure can be recycled 
10. Steel structure building has a short construction period
The design and the construction of the steel structure building is based on customer's needs