China prefabricated warehouse and steel structure construction process

  • group nameSteel Structure Warehouse

  • Min Order500 square meter

  • brand nameZYM steel structure building Manufacturer

  • modelZYM3

  • payment methodL/C, D/A, Western Union, T/T

  • update timeMon, 20 Nov 2023 16:54:40 GMT

Paramtents

  • Name Indonesia steel structure warehouse workshop

  • Key word Indonesia steel structure workshop with office

  • Design 3D max,CAD for steel structure frame

  • Material Q235,Q345B,SS400 steel structure

  • Foof Galvanized color sheet or sandwich panel

  • Wall Galvanized sheet for steel structure workshop

  • Place of project Indonesia steel structure workshop and warehouse

  • Delivery time 30 days after steel structure drawing confirmation

  • Package Steel structure frame pallet for 40HQ container

  • Application workshop,warehouse,office,commercial bulding,shop

Packging & Delivery

  • Min Order500 square meter

Briefing

the total construction area of the production workshop is over 10000 square meters

Detailed

steel structure warehouse

 Project Name: Food Processing Steel Structure Workshop

This project consists of an auxiliary building and a factory building, with the main structural form being the steel structure of the factory building and the frame structure of the auxiliary building; Total construction area: 6930.36 square meters; Total construction period: 366 days; The engineering design is for industrial factory buildings._prefabricated workshop