Iraq Saudi Saudi Arabia high rise commercial Prefabricated Steel Structure Building For Workshop warehouse office hotel hospital

FOB Price
  • US $30.00

    300 - 200,000 square meter

  • group nameSteel Structure Warehouse

  • Min Order300 square meter

  • brand nameZYM steel structure building Manufacturer

  • payment methodL/C, D/A, T/T

  • update timeThu, 25 Jul 2024 18:14:30 GMT

Paramtents

  • application steel structure hospital in Iraq

  • key word steel structure building hospital

  • manufacture China steel structure factory

  • steel China steel structure Q355

  • installation China engineer steel structure installation

  • floors 4 layers steel structure hospital

  • high rise High rise steel structure building with elevator

  • production time 30 days

  • steel structure design free 3D steel structure design

  • software 3D steel structure frame,tekla,CAD

  • steel structure Project located IRAQ

Packging & Delivery

  • Min Order300 square meter

Briefing

Three layers steel structure hospital was built in IRAQ. The steel building has good design ,economical structure,fast erection.

Detailed

steel structure buildings
Iraq Saudi Saudi Arabia high rise commercial Prefabricated Steel Structure Building For Workshop warehouse office hotel hospital



All the steel structure frame were designed according to clients' site environment:

Wind speed: 30m/s

Earthquack level: 6 Level

Second floor and third floor: 200kg/sqm

https://..........com/products2097810/Steel-Structure-Warehouse.htm
This building is a steel structure hospital project in IRAQ.
We make the design ,production,installation to client ,we not only make the production,but also send an steel structure installation engineer to guide.


In order to minimize the cost of customers, we chose  color steel plate for wall panel and roof panel 

However, because the place where the customer is located is a desert place, we choose the epoxy zinc-rich paint 

for steel structure. There is no galvanized steel structure,because the galvanized steel structure is too expensive, and the customer's plant project is not at the seaside, so there is no need to increase the cost of 

the customer.Although the customer requirements are not high, all steel components are thoroughly tested 

by the factory.

The welded welds are very flat and the film thickness is completely up to the customer's anti-corrosion 

requirements.We can make the most expensive steel structure, but we only provide the right one for the 

customer.

steel structure buildings

steel workshop

steel structure building advantages
steel structure building advantages and disadvantages
steel structure apartment building
steel structure of building

Read More 

ZYM After-Sale Service , we will still provide the service after the steel structure installation. 

For further information feel free to contact us