Multi Storey prefabricated Steel Structure Workshop factoryWith Warehouse Algeria Iraq Oman

  • group nameSteel Structure Warehouse

  • Min Order500 square meter

  • brand nameZYM steel structure building Manufacturer

  • modelZYM1

  • payment methodL/C, D/A, Western Union, T/T

  • update timeMon, 12 Aug 2024 17:42:23 GMT

Paramtents

  • Name Algeria Iraq steel structure warehouse workshop

  • Key word Algeria Iraq steel structure workshop with office

  • Design 3D max,CAD for steel structure frame

  • Material Q235,Q345B,SS400 steel structure

  • Foof Galvanized color sheet or sandwich panel

  • Wall Galvanized sheet for steel structure workshop

  • Place of project Algeria steel structure workshop and warehouse

  • Delivery time 30 days after steel structure drawing confirmation

  • Package Steel structure frame pallet for 40HQ container

  • Application workshop,warehouse,office,commercial bulding,shop

Packging & Delivery

  • Min Order500 square meter

Briefing

Double layer steel structure building for workshop and warehouse with good design,fast installation,high quality.

Detailed

steel structure warehouse

            How to build a  Steel Structure Building Project of Algeria Overhaul Plant


Project Name: Steel Structure Building Project of Algeria Overhaul Plant


Project Background: This is a collaborative project between China Electronics Import and Export Corporation and the local government of Algeria in 2017

Project details description: This project is the first large-scale communication vehicle maintenance plant in Algeria, with a construction area of approximately 10000 square meters, including a main plant, substation, and fire pump room. The main plant is a three story steel frame structure. This project is a foreign construction general contracting project, which started construction in March 2017 and was delivered for use in October 2018 after ribbon cutting inspection. It has been running well during use and is currently undergoing normal maintenance work.

Solution: At present, the main work is the maintenance treatment under the normalization of the COVID-19. Since the beginning of the epidemic, materials can now arrive at the project site normally, resident personnel have been vaccinated, and the epidemic prevention and control has been handled in accordance with effective plans and preplans, with personnel replacement once a year. At present, the risk is controllable.

Project Value: This project is another construction general contracting project of the company abroad, which has accumulated more experience for the company to execute general contracting projects abroad, especially in the construction organization and management of steel structure factories abroad. It only took three months from the entry of steel structures to the completion of the main structure, without any rework or safety or quality problems, once again proving what China's speed is.

                                             



How to finish the whole project following the steps:


-Communication And Design

Specificaitons as follows:


a) Provide all the structural steel required for the building which includes foundation anchor bolts, columns, Beams, Roof Beams, Roofing sheets, bolts…etc. (All the steel structure should be epoxy painted).


b) Provide all the Cladding material for the building wall including all required framing for fixing of cladding.


c) Provide all steel structure mezzanine decking materials.


d) Provide all staircases mentioned in the drawing. Tread: 280mm, Height: 167mm.


e) Provide hand railings (staircase) and railings (decks) as per shown in the drawings.| Steel Structure Buildings


f) Provide steel structure building Roofing Sheets including purling, heat insulation material and all required material for fixing of Roof.


g) Careful procedures for steel structure frame erection drawings giving importance to the given drawings.


h) Provide all railings including staircase railings in Stainless steel


i) Provide structural steel parts drawings and structural calculations ) steel Foundation and any other required civil work related designs should be provided.


k) Foundation of the steel structure building should be constrained within the build area and should not extend outside.

l) The steel structure warehouse Load bearing capacity of the soil should be 150 kn/m2.


m) Foundation depth should be 2 meter


The steel structure workshop layout and elevation are designed as follows:




1.1 GENERAL 

The steel structure workshop Drawings shall be read in conjunction with the Specifications and matters referred to, shown or described in the former are not necessarily repeated in the latter. 

1.2 STANDARDS, MATERIALS, GOODS AND WORKMANSHIP 

Materials, goods and workmanship shall be of the best quality of their respective kinds and, as far as applicable, shall comply in every respect with the requirements of the quoted Standards, Codes of Practice and Specifications or any other National Standards approved by the Employer. | Steel Structure Buildings

Preambles and descriptions of materials, goods and workmanship given in any one section of the Specifications shall apply throughout the whole of these Specifications unless otherwise described.  

1.3 SAMPLES BROCHURES AND SHOP DRAWINGS 

The supplier shall provide all the necessary shop drawings.


- Confirmation drawings -Production-QC

2.0 STEEL STRUCTURE METALWORK 

2.1 GENERAL 

Metal work shall be fabricated carefully and accurately to ensure compliance with design and performance requirements, using types and grades of metal as specified for the purpose. The finished work must be free from distortion and cracks. Test certificates should be provided for quality assurance of the metal works supplied. 

2.2 MATERIAL QUALITY 

Shape of steel shall be precise and straight and free of injurious scratches and rust. Metal work shall be fabricated carefully and accurately to ensure compliance with design and performance requirements, using types and grades of metal as specified below; 
All structure members- Hot rolled universal section. | steel structure workshop
Steel Grade- Grade 43 
Steel Strength – 275N/mm2 
All Steels to Conform to BS 5950 

2.3 BOLTING 

Bolts shall be of sufficient length to have at least one complete thread projecting beyond the outer face of the nut when tightened up. Washers shall be provided in all cases. Where necessary, washers shall be tapered or otherwise suitable shaped to give the heads and nuts of bolts a satisfactory bearing. 

2.4 PAINTING TO STEEL  

All steel metal shall be epoxy painted. 

3.0  WALL CLADDING AND ROOFING 

Wall Cladding and Roofing sheets shall be roll formed from not less than 0.5mm (nominal) thick cold-rolled steel coated with an Aluminium and Zinc Alloy (Zincalume). Wall Cladding and Roofing sheets should be pre-painted. Paint finish film thickness shall be 25microns of high durability polyester. 

Cladding and Roofing material shall be to the highest standards and codes of practice. 
The Supplier is responsible for providing Cladding and Roofing material that is completely watertight and corrosion resistant and able to withstand expansion extremes likely to be encountered with temperature fluctuations. The Supplier is to ensure that Cladding and Roofing will be able to withstand normal pedestrian traffic at occasional intervals without sustaining damage of any description. 

Read More 


+ Packing& Delivery 


 Erection




1.5 DEFECT & PROTECTION DURING DELIVERY


During Delivery all delicate workshop materials shall be carefully handled and stored under cover in a manner to prevent deformation and damage to the materials and to prevent rusting and the accumulation of mud, dirt or other foreign matter on the metal work.  


Tag:steel workshopsteel structure buildings


For further information feel free to contact us.


E-mail: sales..........com